
At home in Kronsrode
Rental apartments in the NordKrone project
The new "Kronsrode" residential area is being built on three project sites on the southern Kronsberg. A total of around 4,000 residential units in apartment blocks and terraced houses as well as retail and service facilities, an elementary school and several daycare centers are planned.
Several hundred rental apartments are being built on various construction sites in Kronsrode North. The GWH Wohnungsgesellschaft apartments will be let under the project name NordKrone.
A connecting, spacious city park, a multitude of public squares, green spaces and inner courtyards on the building plots ensure a high quality of life.

Rent an apartment
Are you interested in one of the new rental apartments being built in Kronsrode? Then please contact our sales partner CAMPO Immobilien:
Phone: 0511 8009-5390
E-Mail: info@campo-immobilien.de
Construction site A4

Details at a glance
- 1- to 5-room apartments
- A total of 76 apartments with modern floor plans (22 of which are subsidized)
- 9 wheelchair-accessible apartments (3 of which are subsidized)
- Living space ranging from approx. 38 to 122 square meters
- Balconies, loggias and terraces
- Some ground floor apartments have a small green area
- Fitted kitchens in all privately financed apartments with built-in appliances
- PVC-free design flooring
- Modern bathrooms with floor-level showers, larger apartments also with bathtubs
- Underfloor heating
- Exhaust air systems with individual fans
- Elevators in every building and in the courtyard
- Fiber optic connection in all apartments
- District heating supply with additional air-to-heat pumps
- KfW 55 EE construction, triple-glazed windows, and clinker brick facade
- Solar power from the roof / optional tenant electricity model
- Private storage rooms in the basement
- Bicycle storage rooms
- 61 underground parking spaces
- Charging infrastructure for electric vehicles in the underground parking space with green electricity tariff on request
- Playgrounds in the inner courtyards of the construction site
Energy performance certificate, main energy source electricity (heat pump); final energy consumption 32 kWh/(m²a) (House A, G), 29 kWh/(m²a) (House B), 33 kWh/(m²a) (House C, F), 31 kWh/(m²a) (house D), 34 kWh/(m²a) (house E); energy efficiency class A (houses A, C, D, E, F, G), A+ (house B), year of construction 2024
Construction Site A7

Details at a glance
- 1- to 4-room apartments
- A total of 80 apartments with modern floor plans (24 of which are subsidized)
- 8 wheelchair-accessible apartments (2 of which are subsidized)
- Living spaces ranging from approximately 34 to 107 square meters
- Balconies, loggias and terraces
- Some ground floor apartments have a small green area
- Fitted kitchens in all privately financed apartments with built-in appliances
- PVC-free design flooring
- Modern bathrooms with floor-level showers, larger apartments also with bathtubs
- Underfloor heating
- Exhaust air systems with individual fans
- Elevators in every building
- Fiber optic connection in all apartments
- Solar PV system with additional air-source heat pumps
- KfW 55 EE construction, triple-glazed windows, and clinker brick facade
- Solar power from the roof / optional tenant electricity model
- Private storage rooms in the basement
- Bicycle Parking Basement
- 68 underground parking spaces
- Charging infrastructure for electric vehicles in the underground parking space with green electricity tariff on request
- Playground in the inner courtyard
Energy Performance Certificate, primary energy sources: electricity (heat pump) (House A+X), fossil fuel-fired CHP, electricity mix (Houses B–E); final energy demand 35.2 kWh/(m²a) (House A), 33.6 kWh/(m²a) (House B), 31.7 kWh/(m²a) (House C), 31.6 kWh/(m²a) (House D), 32.5 kWh/(m²a) (House E), 40 kWh/(m²a) (House X); Energy efficiency class A, year of construction 2022 (House A+X), 2021 (House B-E)
Sustainable living
With tenant electricity and heat pumps
In cooperation with Avacon, GWH offers tenants in Kronsrode an environmentally friendly energy supply through tenant electricity. The photovoltaic systems installed on the roofs produce clean electricity that is used directly on site. Tenants benefit from a sustainable power supply at attractive conditions - the electricity price is around 10% below the basic supply tariff. This not only protects the environment, but also your wallet.
In addition to district heating, energy is also provided by modern heat pumps in the GWH construction sites. These provide an additional, efficient heat supply. Particularly sustainable: the heat pumps are largely powered by electricity from the company's own photovoltaic systems.
Mobile in the neighborhood
E-mobility and car sharing
In cooperation with Avacon, GWH provides tenants in Kronsrode with modern wallboxes for charging electric vehicles in the underground garages. With the practical R-fit charging card, you can easily activate your wallbox and conveniently charge your electric car on site. Billing takes place directly between you and Avacon. We also focus on sustainability here: part of the electricity used comes from our own photovoltaic systems.
Since July 1, 2024, GWH has provided two CarSharing parking spaces on construction site A1.2 on Kattenbrookstrift, right next to the tram stop. In cooperation with Stadtmobil Hannover, tenants can access a car flexibly and easily whenever they need it. For more information and to register, visit: Stadtmobil Hannover.
Fully let
Building site A1.1 and A1.2
Details at a glance
- 1- to 5-room apartments
- A total of 233 apartments with modern layouts (60 of which are subsidized)
- 29 wheelchair-accessible apartments (9 of which are subsidized)
- Living space between approx. 32 and 132 square meters
- Duplex apartments with separate access
- Loggias or balconies
- In building plot A1.2, some of the ground-floor apartments have a small green area
- Fitted kitchens in all privately financed apartments with Bauknecht built-in appliances
- PVC-free design flooring
- Modern bathrooms with floor-level showers, larger apartments also with bathtubs
- Underfloor heating
- Central exhaust air systems
- Elevators in every building
- Fiber optic connection in all apartments
- District heating supply
- KfW 55 construction, triple-glazed windows and clinker brick façade
- Solar power from the roof / optional tenant electricity model
- Private storage rooms in the basement or staggered storey
- Bicycle storage rooms
- 175 underground parking spaces
- Charging infrastructure for electric vehicles in the underground parking space with green electricity tariff on request
- 2 Car-Sharing parking spaces
- Playgrounds in the inner courtyards of the construction sites
Information on the energy certificate according to §16a EnEv:
Energy requirement certificate, main energy source local / district heating, CHP + fossil fuel
Final energy requirement 46.9 kWh/(m²a) (Kattenbrookstrift 51-59); 55.8 kWh/(m²a) (Kattenbrookstrift 61-63a); 51.1 kWh/(m²a) (Kattenbrookstrift 67a-69c); 54.5 kWh/(m²a) (Kattenbrookstrift 71-75a); 53.6 kWh/(m²a) (Kattenbrookstrift 65);
Energy efficiency class A (Kattenbrookstrift 51-59), B (Kattenbrookstrift 61-63a, 67a-69c, 71-75a, 65)
Year of construction 2023 (Kattenbrookstrift 51-59), year of construction 2022 (Kattenbrookstrift 61-63a, 67a-69c, 71-75a, 65)
Building site A5

Details at a glance
- 1- to 5-room apartments
- A total of 113 apartments with modern layouts (32 of which are subsidized)
- 15 wheelchair-accessible apartments (5 of which are subsidized)
- Living space between approx. 34 and 118 square meters
- Balconies, loggias and terraces
- Some ground floor apartments have a small green area
- Fitted kitchens in all privately financed apartments with Bauknecht built-in appliances
- PVC-free design flooring
- Modern bathrooms with floor-level showers, larger apartments also with bathtubs
- Underfloor heating
- Central exhaust air systems
- Elevators in every building
- Fiber optic connection in all apartments
- District heating supply
- KfW 55 EE construction, triple-glazed windows and clinker brick façade
- Solar power from the roof / optional tenant electricity model
- Private storage rooms in the basement
- Bicycle storage rooms
- 87 underground parking spaces
- Charging infrastructure for electric vehicles in the underground parking space with green electricity tariff on request
- Car-Sharing parking spaces
- Playgrounds in the inner courtyards of the construction sites
Energy requirement certificate, main energy source electricity (heat pump); final energy requirement 34 kWh/(m²a) (house L), 33 kWh/(m²a) (house M, Q), 32 kWh/(m²a) (house N, R, S), 31 kWh/(m²a) (house O, P), ; energy efficiency class A, year of construction 2024
Construction site A8
Details at a glance
- 1- to 5-room apartments
- A total of 117 apartments with modern layouts (33 of which are subsidized)
- 14 wheelchair-accessible apartments (3 of which are subsidized)
- Living space between approx. 39 and 152 square meters
- Duplex apartments with separate access
- Balconies, loggias, conservatories and terraces
- Some ground floor apartments have a small green area
- Fitted kitchens in all privately financed apartments with Bauknecht built-in appliances
- PVC-free design flooring
- Modern bathrooms with floor-level showers, larger apartments also with bathtubs
- Underfloor heating
- Central exhaust air systems
- Elevators in every building
- Fiber optic connection in all apartments
- District heating supply
- KfW 55 construction, triple-glazed windows and clinker brick façade
- Solar power from the roof / optional tenant electricity model
- Private storage rooms in the basement
- Bicycle storage rooms
- 95 underground parking spaces
- Charging infrastructure for electric vehicles in the underground parking space with green electricity tariff on request
- Car-Sharing parking spaces
- Playgrounds in the inner courtyards of the construction sites
Information on the energy certificate according to §16a EnEv:
Energy requirement certificate, main energy source Energy source combined heat and power, fossil, electricity mix (house A-I); Final energy requirement 22.7 kWh/(m²a) (building A), 24.6 kWh/(m²a) (building B), 24 kWh/(m²a) (building C), 23.6 kWh/(m²a) (building D), 23,3 kWh/(m²a) (House E), 24.2 kWh/(m²a) (House F), 23.8 kWh/(m²a) (House G), 20.7 kWh/(m²a) (House H), 21.1 kWh/(m²a) (House I); Energy efficiency class A+ (house A-I); year of construction 2022 (house A-I)
Construction site A10

Details at a glance
- 122 residential units, 85 of which are privately financed and 37 of which are publicly subsidized
- 15 wheelchair-accessible apartments, 5 of which are publicly subsidized and 10 privately financed
- 1- to 4-room apartments
- Living space between approx. 32 and 106 square meters
- PVC free design flooring
- Level-access showers with suspension for tenant-side shower curtain
- Larger apartments with additional bathtubs
- Underfloor heating
- Central exhaust air systems
- Supply air via top-mounted window ventilator
- Loggias or balconies
- Private storage rooms in the basement
- Bicycle storage rooms
- 84 underground parking spaces incl. e-mobility parking spaces
- KfW 55 EE energy standard
- Houses with PV systems
- Retention roofs (green roofs)
- Daycare center
- Green spaces and play areas
- High-quality building architecture and open spaces, quiet inner courtyards with play areas
Information on the energy certificate according to §16a EnEv:
Energy requirement certificate; main energy source local/district heating; final energy requirement 53 kWh/(m²a) (house A-C), 54.6 kWh/(m²a) (house D-G), 52.8 kWh/(m²a) (house H-J), 56.5 kWh/(m²a) (house R-W); energy efficiency class B; year of construction 2021
Construction site A11
Details at a glance
- 1- to 5-room apartments
- A total of 86 apartments with modern floor plans (28 of which are subsidized)
- 11 wheelchair-accessible apartments (4 of which are subsidized)
- Living space between approx. 39 and 149 square meters
- Balconies, loggias and terraces
- Some ground floor apartments have a small green area
- Fitted kitchens in all privately financed apartments with Bauknecht built-in appliances
- PVC-free design flooring
- Modern bathrooms with floor-level showers, larger apartments also with bathtubs
- Underfloor heating
- Central exhaust air systems
- Elevators in every building
- Fiber optic connection in all apartments
- District heating supply
- KfW 55 EE construction, triple-glazed windows and clinker brick façade
- Solar power from the roof / optional tenant electricity model
- Private storage rooms in the basement
- Bicycle storage rooms
- 82 underground parking spaces
- Charging infrastructure for electric vehicles in the underground parking space with green electricity tariff on request
- Car-Sharing parking space
- Playgrounds in the inner courtyards of the construction sites
Information on the energy certificate according to §16a EnEv:
Energy requirement certificate, main energy source electricity (heat pump), final energy requirement 30 kWh/(m²a) (house A), 29 kWh/(m²a) (house B), 27 kWh/(m²a) (house C, D, E), 28 kWh/(m²a) (house F), 35 kWh/(m²a) (house G), energy efficiency class A (house A, G), A+ (house B, C, D, E, F), year of construction 2024
Neighborhood office
Your local service center
As part of the "NordKrone" new-build project in Hanover Kronsrode, GWH is opening a neighborhood office in construction site A5, which will manage around 1,000 residential units in future.
At this central point of contact, janitors, sales staff and technicians work hand in hand to offer tenants professional advice and support in all matters relating to their apartment.
GWH is also building and renting out a kindergarten on site. Further services are already being planned.
Tenant voices
Infrastructure
Kronsrode is located in the south of Hanover's city center, north of Laatzen and borders on the two districts of Kronsberg and Bemerode.
The urban extension is being built right next to the existing "Stockholmer Allee" light rail stop. This means that the city center can be reached by public transport in just a few minutes without having to change trains. The city center can also be easily reached by bike via the cycle path that runs through the district.
Short distances within the district and the connection to Hanover's Green Ring ensure optimal mobility. The district is directly connected to the highway network via the Messeschnellweg (B6).
The residential area will include an elementary school, several daycare centers, a sports hall, retail, local shops and restaurants, office space and meeting places.
Contact us
Are you interested in one of the new rental apartments?
Talk to our sales partner CAMPO Immobilien and arrange your individual consultation and viewing appointment.
Phone: 0511 8009-5390
E-Mail: info@campo-immobilien.de

Sabine Ruggeri

Christian Hering

Verena Wockenfuss-Hering

